27b Lamborghini Countach Base Variants

British made Matchbox Superfast 1969-83
Locked
User avatar
mbox75
Posts: 1061
Joined: Wed Sep 18, 2013 5:46 pm
Location: Switzerland

27b Lamborghini Countach Base Variants

Post by mbox75 »

Hi All

two diffrent Base Variants Matchbox with and without R:Cheers Mathias.

Image
SITE ADMIN WARNING: ANY PRE-PRODUCTION MODELS PICTURED IN THIS POST BY MBOX75 MAY BE FAKES!
Pierkemimi
Posts: 295
Joined: Thu Dec 05, 2013 11:35 pm

Re: 27b Lamborghini Countach Base Variants

Post by Pierkemimi »

Thanks, great find.
Just checked 9 cars, 3 have no R on base. Two red ones and one yellow car without R.
User avatar
nearlymint
Posts: 2330
Joined: Sun Sep 15, 2013 7:03 pm
Contact:

Re: 27b Lamborghini Countach Base Variants

Post by nearlymint »

Very nice Mathias, I have a mixture of with R and without.
Here is the yellow model(with/without R), also with matt and a gloss black base. Jason
27
27
27.jpg (155.72 KiB) Viewed 540 times
Nearlymint
Check my swaps page(rest has been under construction for years :))
https://sites.google.com/site/matchboxmagicgbbo00/home
User avatar
ChFalkensteiner
Posts: 566
Joined: Sun Sep 15, 2013 3:45 pm
Location: Linz, Austria
Contact:

Re: 27b Lamborghini Countach Base Variants

Post by ChFalkensteiner »

Yes, this appears to be about 50/50, so surely two baseplate dies used concurrently. However, now that I have been alerted to it, the difference seems much too obvious to ignore.

This has just increased the number of variations presumed to exist for this model (only English made, excluding Brazilians) from 129 to 258, of which I have only 39 so far. (One of those has now been transferred from my duplicates into my collection, which I think is a good thing.:))

And I have not even made the distinction between flat and gloss black baseplates yet, nor between the shades of yellow and the shades of red on the bodies, although I have observed these differences in my collection too, so there is still more Countach variation splitting ahead of me.

The number of variations to process increases as the time available for doing it decreases...!
Locked